News
News and practical guides from RAM MULTI INVEST Romania, covering our technical services, workforce mobilisation and preparation for marine, energy and industrial projects.
Read more: Ship Outfitting Stages: From Block Assembly to Delivery
Ship Outfitting Stages: From Block Assembly to Delivery
How outfitting moves from the open block to sea trials and delivery, what two IMO standards check along the way, and what that means for planning trades.
Read more: Turnaround Manpower Planning: From Work List to Crew Plan
Turnaround Manpower Planning: From Work List to Crew Plan
How to build a turnaround manpower plan from the scope, plan shifts with fatigue in mind and agree with contractor crews what has to be settled before they…
Read more: Offshore Decommissioning Process: Phases and the Work Involved
Offshore Decommissioning Process: Phases and the Work Involved
A practical guide to offshore installation removal and the yard phase: planning, safety consent, removal at sea and dismantling ashore, with current OSPAR, UK and Norwegian references.
Read more: Pipe Spool Fabrication vs Field Fitting: Where to Draw the Line
Pipe Spool Fabrication vs Field Fitting: Where to Draw the Line
How to decide which piping joints belong in a workshop spool and which on site, what EN 13480 and ASME B31.3 cover, and what to agree before fabrication…
Read more: Solar Farm Construction Process: Trades and Work Sequence on Site
Solar Farm Construction Process: Trades and Work Sequence on Site
How a utility-scale solar farm is built stage by stage, which trades work at each step, and which EU construction site rules shape the order of work.
Read more: Ship Repair Crew Mobilisation: A Contractor Checklist
Ship Repair Crew Mobilisation: A Contractor Checklist
A ship repair crew mobilisation checklist covering qualifications, shipyard access, induction, posting documents and onboard work. Prepare your team with RAM.
Read more: Near Miss Reporting: What Counts and How to Report It
Near Miss Reporting: What Counts and How to Report It
What a near miss means, which events count, what to put in a near miss report and why workers stop reporting when nothing changes.
Read more: Data Center Electrical Installation: From Design to Site Delivery
Data Center Electrical Installation: From Design to Site Delivery
A practical guide to data center cable containment, electrical installation work packages, sequencing, quality records and workforce mobilisation.
Read more: Posted Workers in the Netherlands: Notification and Payroll Basics
Posted Workers in the Netherlands: Notification and Payroll Basics
How the Dutch posting notification works, which documents must be on site, which Dutch terms apply and when a foreign employer has to withhold Dutch payroll taxes.
Read more: ISO 9606-1 Validity: Welder Certificate Confirmation and Revalidation
ISO 9606-1 Validity: Welder Certificate Confirmation and Revalidation
How the six-month confirmation and the three revalidation methods of ISO 9606-1 keep a welder's certificate valid, and what welders and QA coordinators should check before a job.
Read more: WPS vs WPQR and Welder Qualification: How They Fit Together
WPS vs WPQR and Welder Qualification: How They Fit Together
How the WPS, the procedure qualification record and the welder's own qualification fit together under ISO 15609-1, ISO 15614-1 and ISO 9606-1, with a short document check before…
Read more: Welding Quality Records: Preparing a Clear Project Handover
Welding Quality Records: Preparing a Clear Project Handover
How to organise document references, traceability, inspection status and outstanding items so the handover reflects the work completed.
Read more: Workforce Supply or Technical Subcontracting: Choosing the Right Model
Workforce Supply or Technical Subcontracting: Choosing the Right Model
How to choose between additional workforce capacity and a defined technical work package, with clear supervision and acceptance responsibilities.
Read more: What Is a Marine Riding Squad? Onboard Repair Planning
What Is a Marine Riding Squad? Onboard Repair Planning
A practical guide to what a marine riding squad does and how to prepare the vessel, work scope, logistics, permits, inspection and handover.
Read more: Industrial Workforce Planning: Build the Team Around the Work
Industrial Workforce Planning: Build the Team Around the Work
Plan the trades, crew size and mobilisation sequence around available work fronts, materials, supervision and project priorities.
Read more: Romanian Technical Workforce for European Industrial Projects
Romanian Technical Workforce for European Industrial Projects
How RAM MULTI INVEST Romania builds a project discussion around the work scope, required trades, supervision and mobilisation needs.
Read more: Piping Work Packages: From Drawings to Site Installation
Piping Work Packages: From Drawings to Site Installation
What a piping work package should explain before fabrication, fit-up and installation teams arrive on site.
Read more: Industrial Crew Mobilisation: A Practical Project Checklist
Industrial Crew Mobilisation: A Practical Project Checklist
What to agree before an industrial crew travels: work scope, personnel documentation, site access, logistics and the first-shift plan.
Read more: Welding Procedure Checks Before Mobilising a Crew
Welding Procedure Checks Before Mobilising a Crew
A practical checklist for matching welding procedures, qualification records and site requirements before a crew mobilises.
Read more: Contractor Prequalification: What to Request Before a Project
Contractor Prequalification: What to Request Before a Project
A procurement checklist for reviewing the actual contracting entity, proposed personnel, experience and project-specific evidence.
Read more: Voyage Repairs: Doing Repair Work While the Ship Sails
Voyage Repairs: Doing Repair Work While the Ship Sails
How voyage repairs fit into the ISM Code safety management system, what a superintendent should agree before the team boards, and how the work is run at sea.
Read more: Cruise Ship Repair, Refit and Refurbishment: How Dry-Dock Work Is Planned
Cruise Ship Repair, Refit and Refurbishment: How Dry-Dock Work Is Planned
A practical guide to the difference between cruise ship repair, refit, refurbishment and outfitting, and how each scope fits into dry-dock planning.
Read more: Posting Workers in the EU: A Step-by-Step Guide for Employers
Posting Workers in the EU: A Step-by-Step Guide for Employers
A practical walk-through of EU posting rules for employers: host country terms, social security, the posting declaration, site documents and duration limits.
Read more: The A1 Certificate for Posted Workers: What It Proves and How It Works
The A1 Certificate for Posted Workers: What It Proves and How It Works
What the Portable Document A1 proves, the conditions in Regulations 883/2004 and 987/2009, how employers request it, and what it does not cover.
Read more: HSE Key Performance Indicators: Leading and Lagging Examples
HSE Key Performance Indicators: Leading and Lagging Examples
How leading and lagging HSE indicators work on industrial projects, how the common injury rate is calculated, and a compact KPI set a contractor crew can act on.






















